ROW cross-sections of a power lines b waterways (case of shipping canal) c railways and roads. Caption: Dotted red line: side boundaries of the entire ROW; Brown line: ground surface; Double green arrows: extent of ROW portions considered in the estimate; P: pylon; W: wooded area; SC: shipping canal; E1 and E2: easements of waterways; RP: railway or road platform; PS: proximity/safety strip; FA: far area.

 
 
  Part of: François D, Medous L, Etrillard C (2024) Use of linear transportation infrastructure rights-of-way as an ecological shelter: National asset estimate and stakeholder involvement. In: Papp C-R, Seiler A, Bhardwaj M, François D, Dostál I (Eds) Connecting people, connecting landscapes. Nature Conservation 57: 17-40. https://doi.org/10.3897/natureconservation.57.107089