Review Article |
Corresponding author: Stefan Möckel ( stefan.moeckel@ufz.de ) Academic editor: Doug Evans
© 2017 Stefan Möckel.
This is an open access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Citation:
Möckel S (2017) The European ecological network "Natura 2000" and its derogation procedure to ensure compatibility with competing public interests. In: Möckel S (Ed.) Natura 2000 appropriate assessment and derogation procedure – legal requirements in the light of European and German case-law. Nature Conservation 23: 87-116. https://doi.org/10.3897/natureconservation.23.13603
|
Natura 2000 network covers over 18 percent of the land area in the European Union. All proposals for development affecting these sites must be previously assessed for their implications for the site’s conservation objectives. In cases where it cannot be ascertained that there is no adverse effect on the integrity of a Natura 2000 site, the proposal for development can now only be approved within the scope of a derogation assessment pursuant to Article 6(4) of the Habitats Directive 92/43/EEC
European Union (EU), Natura 2000, appropriate assessment, impact assessment, derogation procedure, Article 6(4) Habitats Directive, Birds Directive, imperative reasons of overriding public interest (IROPI), assessment of alternatives, compensatory measures, coherence, case law, ECJ, Germany, BVerwG
The ecological network “Natura 2000” constitutes the common European heritage and, in 2017, covers over 27,500 sites that protect more than 789,000 km2 of the terrestrial area in the EU (approx. 18.15%) and around 395,000 km2 of European marine territory. It contains the Sites of Community Importance (SCIs) brought into being by Article 4 HD and the Special Protection Areas (SPAs) in Article 4 of the Birds Directive 79/409/EEC
In cases of priority natural habitat types or priority species of Annex I and II of the Habitats Directive, an exemption is only justified by considerations associated with human health and public safety or has beneficial consequences of primary importance for the environment or further to an opinion from the Commission. It is not just the appropriate assessment,
The European Commission also commissioned an evaluation study to investigate how the appropriate assessment is used in the Member States.
According to both the online surveys and the structured interviews, it seems that the derogation procedure under Article 6.4 is rarely used. The Commission’s own statistics seem to indicate the same trend. In addition only 20 Commission Opinions have been issued under Article 6.4 in the last 20 years and all but one of these was positive. It also varies from one country to another, with countries like Germany tending to use it more often than others.
There may be several reasons for the limited use of Article 6.4: solutions are found through mitigation in Article 6.3, good alternatives are available, IROPI [author: imperative reasons of overriding public interest] test not fulfilled, compensation measures too expensive or onerous….
But there does also seem to be an aura of fear about the use of Article 6.4 that it will lead to considerable delays and extra expenses. Some countries seem to try to push everything through under Article 6.3 to avoid having to use 6.4. and may fudge the differentiations between mitigation measures and compensation measures, either deliberately (to speed up the process) or because of a basic lack of understanding of the differences between the two (which in turn can be due to the fact that the Article 6.4 procedure is so rarely used so there is little practical experience to guide them) or because there is a lack of political will to take the Article 6.4 route.
Another reason might be (mentioned occasionally in the literature but not raised explicitly during the structured interviews) that a number of Natura 2000 habitat types and species, are extremely difficult to compensate because of their inherent nature.
The fact that the European Commission has only issued 20 opinions in line with Article 6(4) subparagraph 2 in the past 24 years since the Habitats Directive was enacted, of which 14 affected Germany, is also indicative of minimal use of the derogation procedure.
The requirements of Article 6(4) HD are not so often subject of ECJ decisions and in the English literature.
If a project or plan must be prohibited in accordance with Article 6(3) HD, the responsible authority may overrule this and authorise a proposed development under the standard conditions given in Article 6(4) HD. Article 6(4) HD is a manifestation of the Principle of Proportionality under European Community Law in Article 5(4) TEU as well as of the aims of sustainable development within the meaning of Article 11 of the Treaty on the Functioning of the European Union (TFEU).
The conditions for a derogation are:
• The plan or project must be carried out for imperative reasons of overriding public (IROPI), including those of a social or economic nature.
• There is no alternative solution.
• The Member State takes all compensatory measures required to ensure that the overall coherence of the Natura 2000 network is protected.
Counter to the view of the European Commission,
In their form as an exemption, Article 6(4) HD and the requirements specified therein are to be narrowly interpreted.
Based on its derogating nature, Article 6(4) of the Habitats Directive establishes an avoidance rule that shall be strictly adhered to and cannot simply be breached at the expense of the integrity of the coherent system, as stipulated by Article 4 of the Habitats Directive, if this appears justifiable based on the pattern of rules for consideration given in German Planning Law, but can only be thrust aside if this is compatible with the concept of the greatest possible protection of the interests that are legally protected by the Habitats Directive (decisions of 27 January 2000 loc. cit. p. 310 and of 17 May 2002 - BVerwG 4 A 28.01 - BVerwG decision 116, 254 <263>). These principles, developed for the assessment of alternatives, also apply to the assessment of imperative reasons of overriding public interest.
In the event that a proposed development is authorised in accordance with Article 6(4) HD, then its realisation is not prohibited based on Article 6(2) HD.
The decision on the derogation is subject to full verification by the courts.
A derogation is only permissible based on Article 6(4) subparagraph 1 HD if the proposed development is required due to imperative reasons of overriding public interest, including those of a social or economic nature. The public interest must significantly outweigh the conservation interests. This requires weighing up of the “imperative reasons of overriding public interest” against the equally public interest in the “integrity of the Natura 2000 site”.
Diverse public interests come into consideration as possible reasons.
The ECJ has hereby taken action against solid private interests being disguised as for the common good. In exceptional cases, infrastructure for the establishment or expansion of a company may fulfil these conditions.
Due to Article 6(4) HD it must be differentiated hereafter between sites with and without priority habitat types and species.
According to the European Commission, “imperative reasons of overriding public interest” also include the fact that the proposed development proves “essential” to fulfilling weighty interests for the common good and that the authorities must provide evidence for its actual requirement.
In this respect, based on settled case law, the presence of practical constraints that cannot be avoided by anybody is not required; Article 6(4) of the Habitats Directive simply presumes governmental handling that is guided by reason and a sense of responsibility, whereby, however, public interests that are of lesser importance are excluded, such as leisure-related needs in sites with priority species (decisions of 17 January 2007 - BVerwG 9 A 20.05 - BVerwG decisions (BVerwGE) 128, 1 margin number 129 and of 28 March 2013 BVerwG 9 A 22.11 margin number 99 with further references).
The proposed development must simultaneously be shown to be suitable to achieving the public aims without any reasonable doubt. The expectation that, for example, a motorway, navigable waterway or an expansion of an airport will increase the economic power of a region and reduce unemployment must therefore to be expected to a high degree based on recognised forecasting methods. Simple hope is therefore insufficient. If the BVerwG only makes the same demands as for the general justification for planning submissions with regard to the accuracy of forecasting (are the facts completely ascertained and the prediction method correctly used),
A detailed justification is required in each case to establish what gives rise to significance in relation to weighting. Recognised criteria include:
• the European or constitutional weighting of the purpose being pursued (cf. Article 6(4) subparagraph 2 HD, Article 3(1)-(3) TEU, Article 11 TFEU),
• the level of the actual or forecast requirement for the planned proposed development (e.g. traffic demand for a road or easing of traffic congestion in a town),
• the uncertainties in relation to forecasting that are associated with the proposed development,
• the urgency for the proposed development,
• whether or not the aims pursued with the proposed development are prescribed by legally or politically, whereby statutory provisions carry greater weight,
• the level of substantiation for the aims and purposes that are given
• the long-term nature of a public purpose that is being pursued, whereby short-term purposes, e.g. in the case of an accident, may carry greater weight.
During the process of weighing up, it must be noted that the weight of the public interests that support the proposed development is reduced by other competing public interests. For example, this is the case when a motorway or coal-fired power station may well be desired for reasons of boosting the economy or supplying energy, but simultaneously contravenes European and national obligations on climate protection and emission control, or other sustainability objectives.
The BVerwG adjudicated as follows on the weight of interests in the integrity of the site:
The weighting that is to be applied to interests in integrity in the weighing-up process is critically dependent on the extent of the adverse impacts (…). Both a qualitative and a quantitative evaluation of the adverse impact are required. A differentiated assessment is crucial, in which the importance of the Site of Community Importance to the Natura 2000 network must be considered on European, national and regional scales (…). Adverse impacts on a Site of Community Importance may be allocated variable weighting, for example, when there is only minor exceeding of the threshold of significance, if there is pressure due to the site having suffered previous damage, the proposed development only affects a relatively small portion of the site or only impacts on one area that is of low-level importance to the networking of the coherent system, Natura 2000. In addition to the extent of the adverse impact, other decisive factors include the importance of the habitats and species that are affected and their conservation status, the level of threat to the affected habitat type or species and the dynamics of their development (…). The appropriate assessment forms the basis for the evaluation. This provides information on the type and scope of significant impacts that have been determined and pressure on the site due to previous damage.
According to the German Federal Administrative Court (BVerwG), the question remains open as to whether the intended compensatory measures for ensuring coherence are to be considered to have a reducing effect when weighing up the effects of a proposed development.
To date, the overriding imperative reasons that have been recognised in case law include: drinking water supplies and agricultural irrigation;
Article 6(4) subparagraph 2 HD exacts higher demands of weighting for “imperative reasons of public interest” if priority natural habitat types or priority species occur at the site, which must be given higher levels of protection. Priority habitat types and species are only designated (with an “*”) in Annexes I and II of the Habitats Directive and not in the Birds Directive, meaning that no priority birds exist. Derogations can therefore not be justified for these sites in every case that is in the public interest.
Article 6(4) subparagraph 2 HD limits the reasons to public interests that are associated with human health and public safety or have beneficial consequences of primary importance for the environment. These public interests are also of overriding importance based on European agreements and German Constitutional Law (cf. Articles 11, 45(3), 52(1), 114(3) TFEU). Nevertheless, in spite of these cases being mentioned specifically, assessment of an individual case cannot be dispensed with as approval of the proposed development is still dependent on its weighting and requirement on a case by case basis.
Based on the higher level of protection demanded in these cases, both the other reasons and the three stated interests are to be narrowly defined.
An opinion from the European Commission is to be obtained before a decision on the derogation is taken if none of the specifically mentioned reasons favour a proposed development. This procedural involvement serves the purpose of ensuring special protection of priority habitats and species and should put the Commission in the position to undertake its own evaluation of the potential adverse effects. According to the BVerwG, it must therefore be provided with comprehensive information.
In the presence of a positive opinion or an erroneous rejection, reasons of public interest within the meaning of Article 6(4) subparagraph 1 HD may also justify interventions in the interests of the integrity of the Natura 2000 site.
The protective system classifies its priority elements as in need of greater protection than non-priority elements (cf. …) . From the perspective of proportionality, this results in ‘only a limited number of such imperative reasons’ appearing suitable for justifying an adverse impact on priority habitat types or species (cf. ECJ, decision of 14 April 2005 – adjudication C-441/03 – Summary of Decisions 2005, I-3043 margin number 27). Public interests, that can surface in a variety of guises, that are of lesser importance are thus excluded a priori (e.g. leisure-related needs of the population; see ECJ, decision of 28 February 1991 – adjudication C-57/89 – Summary of Decisions 1991, I-883 margin number 22). Imperative reasons of overriding public interest must generally at least fulfil the strict demands of common good given in Article 14(3) first sentence of German Constitutional Law (cf. decision of 16 March 2006 – BVerwG 4 A 1075.04 – BVerwG decision (BVerwGE) 125, 116 margin number 566 on Article 16(1) character c) of the Habitats Directive). In addition, in order to achieve the level required by Article 6(4) subparagraph 2 of the Habitats Directive, similarly weighty interests in the common good must be pursued through the proposed development, as have been explicitly mentioned as examples by the Council in Article 6(4) subparagraph 2 of the Habitats Directive (decision of 17 January 2007 loc. cit. margin number 129; Hösch, German Environmental and Planning Law (UPR) 2010, 7 <8 et seq.>; more closely probably Frenz, UPR 2011, 100 <103> and Günes/Fisahn, EurUP 2007, 220 <227>).
No alternative solutions are permitted to exist based on Article 6(4) subparagraph 1 HD and evidence for this must be provided according to the ECJ.
The question arises as to what a notable alternative can be. The Habitats Directive remains silent on this. In Germany, the legislature has therefore defined an alternative more closely in § 34(3) no. 2 of the Federal Nature Conservation Act, in the sense that it must be reasonable and the purpose that is being pursued by the project can hereby be achieved in a different location, with or without a lower adverse impact. This definition was further embellished by the BVerwG:
If the objective of the project can be realised in a location that is more favourable based on the conservation concept of the Habitats Directive or the intensity of the intervention can be reduced, then the project proponent must make use of this option. The developer shall not be granted any room for manoeuvre of any kind. In contrast to the specialist planning assessment of alternatives, the Habitats Directive statutory assessment of alternatives does not form part of a planning consideration. The authority is granted no scope for judgement in relation to the comparison of the alternatives. […] The requirements for the exclusion of alternatives increase progressively in relation to how suitable they are to the realisation of the aims of the proposed development, without leading to obvious - without reasonable doubt - disproportionate adverse impacts. What is therefore decisive in this matter is whether imperative reasons of overriding public interest demand the realisation of exactly this alternative, or whether these reasons can also be fulfilled with a different alternative (final applications by the Advocate-General Kokott on adjudication C-239/04 – summary decisions 2006, I-10183 margin number 43, 46).
The responsible authority is also under the obligation to fully assess the alternatives on its own motion and is not permitted, for example, to limit this assessment to the alternatives considered by the developer without conducting its own assessment, as the Natura 2000 impact assessment, overall, is an official assessment and authorisation procedure.
However, settled BVerwG jurisdiction imposes four restrictions on what are essentially strict standards for assessment:
1. the alternative must not result in a different project,
2. it must be realisable and proportionate,
3. it shall not have a significant adverse impact on public interests and
4. it must be more advantageous to the Natura 2000 network.
The high levels of protection of the integrity of Natura 2000 sites and the coherence of the network that demand the greatest possible levels of care are to be considered with reference to the scope of these four conditions. Therefore, only weighty reasons can justify the exclusion of an alternative solution.
In the case of proposed linear developments (e.g. roads, railways), the search for alternatives must not be limited solely to the planning corridor, i.e. the course of the route most suited to the aims of the proposed development from a transport perspective.
In detail, the BVerwG states:
However, only those changes shall be regarded as an alternative that do not touch upon the identity of the proposed development. An alternative can no longer be referred to as such in cases where this results in a different project, where the aims pursued in a permissible manner by the developer can no longer be realised. An expectation of curtailment to the degree of fulfilment of these aims is the only reasonable option. In contrast, a planning variant does not need to be considered if it cannot be realised without giving up independent partial aims that are being pursued through the proposed development (…).
An alternative that results in a different project is therefore not an alternative that needs to be considered. In the prevailing view in Germany this shall apply, in particular, to system or concept alternatives and abandonment (so-called zero-option).
But the subjective notions of the developer and the proponent’s weighting of different partial aims are not relevant to the question of when a different project is present.
Furthermore, compromises in relation to the degree of fulfilment of the aims are insignificant if the partial aims excluded in an alternative do not serve overriding public interests or only serve private interests in situations with mixed interests (e.g. airports). In cases where the proposed development will actually affect priority habitat types or species, non-realisable partial aims must serve the overriding important public interests given in Article 6(4) subparagraph 2 HD (see 3.2).
Alternatives that are not possible for statutory or actual reasons, or where the likelihood of realisation is highly uncertain, are purely theoretical alternatives and not admissible.
Furthermore, according to the BVerwG, alternatives that are associated with disproportionate costs are also excluded based on the principle of proportionality in Article 5(4) TEU:
The reasonable level of attempts at avoidance must not exceed any sensible relation to the gains that can thereby be achieved for nature and the environment. In this context, financial considerations may tip the balance. Whether the costs are disproportionate to the protective system laid down in accordance with Article 6 of the Habitats Directive shall, as always, be weighed up against the shared protected natural resources that are adversely affected. The guiding principle for this is provided by the severity of the adverse impact on the site, the number and importance of any habitat types or species that may be affected and the degree of incompatibility with the conservation aims.
However, based on a recent ECJ decision, arguments relating to costs are essentially less important than the interests in integrity:
In consideration of the narrow interpretation of Article 6(4) of this Directive, which was referred to in margin number 73 of the above decision, the selection of alternative solutions shall therefore be prohibited from being based solely on the economic costs of such measures.
In the disproportionate financial question, the financial power of the developer must therefore not be considered, something that is also often difficult to determine in the not uncommon case where the government is the proponent (e.g. road and rail construction) and might well be achieved in exceptional cases. Furthermore, the comparison must also not simply focus on the construction and maintenance costs of the project and the alternative. However, in some of its decisions, the BVerwG has approved the exclusion of alternatives due to higher construction costs, without the provision of any further justification or weighing-up.
Quite rightly, the BVerwG stipulates that disproportionality must be assessed in relation to the achievable protection of the Natura 2000 network. However, this cost-benefit analysis also raises questions that are very difficult to answer as costs must be compared with non-monetary values in such cases. The Natura 2000 sites and their natural resources have no monetary value, rather more; only potential estimates can be made of their “cash” value.
Given the difficulties associated with determining disproportionality, the exclusion of an alternative solely due to disproportionate costs should only be possible in rare, very clear cases, whereby further reasons should also militate against the alternative.
According to the general weighting of the conservation interest in conjunction with other interests in Article 6(4) HD, the BVerwG excludes any alternatives that, contrary to the planned development, have a significant adverse impact on other public interests.
The alternatives that are to be considered must be more advantageous to both the affected site and to the entire Natura 2000 network. This is the case if an alternative would not have a significant adverse impact on any of the Natura 2000 sites. If other Natura 2000 sites are also affected, then after the BVerwG an alternative is only more favourable if there are no adverse impacts on priority habitat types or species in these sites:
In the event that the solution issued with planning approval and a planning alternative both have an effect on Sites of Community Importance, then a coarse analysis shall be carried out and the decision shall be made solely on the basis of the severity of the adverse impact, based on the characteristics used for differentiation laid down in Article 6 of the Habitats Directive. The investigation shall therefore only focus on whether there is an adverse impact on habitat types in Annex I or on animal species in Annex II of the Habitats Directive and whether the habitat types that are adversely affected are classified as priority or non-priority. In contrast, the criteria for more detailed differentiation that must be noted when registering a site (Article 4(1) subparagraph 1 first sentence Habitats Directive in association with Annex III phase 1) shall not be considered in the comparison of routes; a differentiation within the stated groups based on the value and number of affected habitat types or species and the given intensity of the impact shall therefore not be repeated within the stated groups (…).
In other words, the BVerwG states that an alternative is eliminated if priority or only non-priority natural resources are affected in the proposed variant and in the alternative solution.
This generalising coarse differentiation that does not consider the differences in severity of the adverse impacts on sites cannot be viewed as in compliance with the Directive.
• loss of land in the site due to construction works and installations, resulting in the destruction of, or adverse impacts on, types of habitat and habitats and territories occupied by some species,
• effects of cutting through the site or barriers within the site as well as in relation to habitats or populations outside the site, especially in the case of roads, railway lines and waterways, but also e.g. in the case of larger scale wind power plants or opencast mining,
• risk of collisions due to, for example, the operation of roads and railways or wind energy systems,
• changes to the water balance in the landscape through, for example, a reduction in the groundwater level or changes to/diversions of water bodies to make space for, e.g. roads or railways, mines, energy production, drinking water production or agriculture,
• emission of noise, vibration, light and compounds within or into the site from the outside, such as nitrogen emissions from roads, power plants or agricultural land or chloride emissions from roads due to winter salting.
Article 6(4) subparagraph 1 HD gives no indication that the differentiated assessment of the effects of a proposed development as stipulated in Article 6(3) HD is now to be irrelevant to the examination of alternatives.
Pursuant to Article 6(4) subparagraph 1 HD, all necessary compensatory measures are to be taken to ensure that the global coherence of Natura 2000 is protected. European law on the conservation of natural habitats is designed to achieve a good conservation status for the selected species and habitat types in their natural areas of distribution across the entire European Union. In this process, the Natura 2000 sites are important keystones for the green infrastructure that is to be expanded in the EU.
In accordance with Article 6(4) subparagraph 1 HD, the safeguarding of this coherence constitutes a condition for authorisation and is not simply a legal consequence.
The organisation of the compensatory measures to ensure the coherence shall be functionally tailored to dealing with the specific adverse impact that triggered the requirement for such measures. This process shall document the affected habitats and species in comparable dimensions, refer to the same biogeographical region in the same Member State and plan functions that are comparable to those based on which the original site was selected (…). Measures include the restoration or improvement of the remaining habitat or the new creation of habitat that is to be incorporated into the Natura 2000 network (…). Compensatory measures to safeguard coherence do not necessarily have to be implemented in the immediate vicinity of the adverse impact; rather more, the replacement of the loss that the site will suffer in relation to its function for the biogeographical distribution of the affected habitats and species is sufficient (…).
From a temporal perspective and different to mitigation measures in the appropriate assessment, the implementation of compensatory measures is generally sufficient if left until the proposed development is realised - even if the functional losses are only compensated for in the long term - so long as this does not result in the threat of irreversible damage.
The assessment of whether or not a measure is suitable must be based exclusively on specialist conservation standards, whereby, in this case – unlike for mitigation measures– a high probability of effectiveness based on the current state of scientific knowledge
However, compensatory measures cannot in principle already be required by other statutory obligations without the proposed development, due to in this case there will be no supplementary compensation of the adverse impacts caused by the project or plan.
The following individual compensatory measures are among those that are recognised by the BVerwG:
In line with Article 2(3) HD and the Principle of Proportionality mentioned in Article 5(4) TEU, the derogation procedure in Article 6(4) HD helps to align economic and social interests with conservation interests. To enable developments judged to be of imperative reasons of overriding public interests and without an alternative solution, Article 6(4) HD allows projects and plans, even if the assessment under Article 6(3) HD comes to the conclusion, that adverse effects on the integrity of a Natura 2000 site cannot excluded without reasonable scientific doubts. In these cases, the conservation interest is restricted to ensure the overall coherence of Natura 2000. Thus, on the one hand, compensatory measures become of high practical importance in Article 6(4) HD and must be sufficiently secured. On the other hand, the application and interpretations of Article 6(4) HD must not be stretched, but must be narrow, in order to achieve the overarching goals of the Habitats Directive, pronounced in Article 2, in ensuring the integrity of each Natura 2000 site and maintaining or restoring favourable conservation status of natural habitats and species of wild fauna and flora of Community interest within the biogeographic regions. The derogation procedure should not become the norm for projects and plans containing risks of significant effects on the integrity of sites. The general rule in Articles 6(3) HD is that such projects and plans are not allowed.
The intensive legal discussion and the comprehensive case law in Germany with regard to Article 6(4) HD are meaningful as the ECJ has as yet had little opportunity to enter into the individual requirements for a derogating authorisation. In particular, the BVerwG decisions in relation to this, which are well disposed towards proposed developments, have weakened the Natura 2000 appropriate assessment. The outcome of this is that derogating authorisations have become standard in Germany for governmental infrastructural development that is actually incompatible with conservation objectives. In spite of the more or less secured compensatory measures to ensure the overall coherence of Natura 2000, the resultant economic and social advantages contrast with the substantial disadvantages for the conservation aims in the affected Natura 2000 sites. Overall, all the smaller and greater derogations endanger the goals of the Habitats Directive. This raises significant doubts about the conformity of the German interpretation to the Directive. It remains incomprehensible why the European Commission does not include these conformity doubts in their actual infringement procedure against Germany from 2014, initiated due to insufficient designation of Natura 2000-sites.
Due to the precautionary principle and importance of Natura 2000 sites, the common heritage Article 6(4) HD should be applied restrictively as an exemption and must not become the standard. In this sense, the conditions for a derogation must be interpreted strongly, such that:
1. Imperative reasons of overriding public interest, which require the proposed development, must be essential to fulfilling weighty interests for the common good and actually necessary and they project or plan must be suitable to achieving the public aims without any reasonable doubt.
2. There are no reasonable alternatives, including system alternatives, alternative sites and the zero-option, by which the overriding public interest in the project or plan (e.g. regional development, employment, transportation of persons or goods from A to B) could also be reached without greater sacrifices for Natura 2000.
3. Adequate compensatory measures with a high probability of effectiveness are being taken and monitored for their effectiveness – both primarily at the cost of the developer – to preserve the overall coherence of Natura 2000, whereby the differentiation to conservation measures should not be so strict that no possibilities for compensatory measures remain.
The author thanks the reviewers for their very helpful comments and suggestions and Textworks Translations for the translation of the manuscript and the cited sections of decisions of the BVerwG.
1 Council Directive of 21.5.1992 on the conservation of natural habitats and of wild fauna and flora, OJEU no. L 206 of 22.7.1992, p. 7 et sqq.
2 All ECJ decisions can be located based on their case number and can be freely accessed under: curia.europa.eu/juris/recherche.jsf?language=en.
3 From 2002 onwards, BVerwG decisions can be located based on their case number and can be freely accessed under: http://www.bverwg.de/entscheidungen/entscheidungen.php. References to the locations of earlier decisions are provided in this article.
4 Council Directive of 2.4.1979 on the conservation of wild birds, OJEU n. L 103 of 25.4.1979, p. 1 et sqq.
5 Directive on the conservation of wild birds, adopted by the European Parliament and Council on 30.11.2009, OJEU no. 20 of 26.1.2010, p. 7 et sqq.
6
7 Directive on environmental liability with regard to the prevention and remedying of environmental damage, adopted by the European Parliament and Council on 21.4.2004, OJEU no. L 143 of 30.4.2004, p. 56 et sqq.
8 e.g. ECJ, adjudication of 26.4.2017 – C-142/16, margin numbers 33; adjudication of 15.5.2014 – C-521/12, margin number 20 et seq.; adjudication of 11.4.2013 – C-258/11, margin number 41; adjudication of 7.9.2004 – C-127/02, margin number 41–49, 56–59.
9cf. ECJ, adjudication of 14.4.2005 – C-441/03, margin number 27; BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 48; BVerwG, decision of 5.9.2012 – 7 B 24.12, margin number 7, 12.
10 see Möckel Nature Conservation 2017.
11 Milieu, IEEP and ICF 2016, p. 104
et sqq.;
12 can be accessed on http://ec.europa.eu/environment/nature/natura2000/management/guidance_en.htm
13
14 Milieu, IEEP and ICF 2016, p. 104 et sqq.
15Sundseth/Roth 2013.
16Sundseth/Roth 2013, p. 63.
17 European Commission, European Commission Opinions relevant to Article 6 (4) of the Habitats Directive, http://ec.europa.eu/environment/nature/natura2000/management/opinion_en.htm (accessed on 2.5.2017). See also McGillivray 2015, p. 101 (109 et sqq.).
18 see assessment of the German Minister of Environment and Nuclear Safety, cited in Sundseth/Roth 2013, p. 28.
19cf. McGillivray 2015, p. 101 (106 et sqq.).
20 ECJ, adjudication of 15.5.2014 – C-521/12 – Briels, margin number 32; adjudication of 21.7.2016 – C-387/15 and C-388/15 – Vlaams Gewest, margin number 52-56.
21
22cf. ECJ, adjudication of 11.7.1996 – C-44/95, margin number 37; BVerwG, adjudication of 18.7.2013 – 4 CN 3.12, margin number 29 et seq.; adjudication of 17.1.2007 – 9 C 20.05, margin number 129. More detailed in Möckel JEEPL 2014, 392 (402 et sqq., 405 et sqq.).
23 ECJ, adjudication of 28.1.1991 – C-57/89, margin number 22 et sqq.; adjudication of 2.8.1993 – C-355/90, margin numbers 19 and 45; adjudication of 18.12.2007 – C-186/06, margin number 37. Following BVerwG, adjudication of 16.3.2006 – 4 A 1075.04, margin number 550; adjudication of 1.4.2005 – 4 C 2.03, margin number 40.
24cf. McGillivray 2015, p. 101 et sqq.; Jackson Journal of Environmental Law 2014, 495 et sqq.; McGillivray Journal of Environmental Law 2012, 417 et sqq.; Clutten/Tafur 2012, 167 et sqq.; Krämer Journal of Environmental Law 2009, 59 et sqq.; Unnerstall European Environment 2006, 73 et sqq. See also reviews in Sundseth/Roth 2013, 101 et sqq. and Blicharska et al. Biological Conservation 2016, 110 et sqq.
25cf. ECJ, adjudication of 11.9.2012 – C-43/10, margin number 136 et seq.
26
27 In the English, French and Spanish versions, however, the alternatives are mentioned first.
28 see also ECJ adjudication of 11.9.2012 – C-43/10, margin number 114; adjudication of 26.10.2006 – C-239/04, margin number 34.
29 settled ECJ case law, adjudication of 14.1.2016 – C-399/14, margin number 56 et seq.; adjudication of 15.5.2014 – C-521/12, margin number 36; adjudication of 11.4.2014 – C-258/11 margin number 35; adjudication of 16.2.2012 – C-182/10 margin number 74 et seq.; adjudication of 24.11.2011 – C-404/09, margin number 109, 157.
30 cf. ECJ, adjudication of 15.5.2014 – C-521/12 – Briels, margin number 36; adjudication of 24.11.2011 – C-404/09, margin number 109; BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 392.
31cf. ECJ, adjudication of 4.3.2010 – C-241/08, margin number 72; adjudication of 26.10.2006 – C-239/04, margin number 25; adjudication of 21.7.2016 – C-387/15 and C-388/15 – Vlaams Gewest, margin number 63.
32 BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 15; adjudication of 6.11.2013 – 9 A 14.12, margin number 74; decision of 3.6.2010 – 4 B 54.09, margin number 9. Differing BVerwG, adjudication of 10.4.2013 – 4 C 3.12, margin number 19 for proposed developments for national defence.
33 settled ECJ case law, adjudication of 14.1.2016 – C-399/14, margin number 73; adjudication of 20.9.2007 – C-304/05, margin number 83; adjudication of 26.10.2006 – C-239/04, margin number 35.
34 ECJ, adjudication of 11.4.2013 – C-258/11, margin number 33 et sqq.
35cf. ECJ, adjudication of 11.4.2013 – C-258/11, margin number 32-37.
36cf. ECJ, adjudication of 11.9.2012 – C-43/10, margin number 114, 117; adjudication of 15.5.2014 – C-521/12 – Briels, margin number 35 et seq.; BVerwG, adjudication of 1.4.2015 – 4 C 6.14, margin number 28.
37 BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 15. similar to BVerwG, decision of 3.6.2010 – 4 B 54.09, margin number 9; adjudication of 6.11.2013 – 9 A 14.12, margin number 79.
38 ECJ, adjudication of 3.4.2014 – C-301/12, margin number 34; adjudication of 24.11.2011 – C-404/09, margin number 122 et sqq., 154 et seq.
39 ECJ, adjudication of 11.4.2013 – C-258/11, margin number 32.
40cf. ECJ, adjudication of 24.11.2011 – C-404/09, margin number 122.
41 ECJ, adjudication of 14.1.2016 – C-399/14, margin number 52; adjudication of 15.5.2014 – C-521/12, margin number 19
42cf. ECJ, adjudication of 14.1.2016 – C-399/14, margin number 68 et seq.; 74-78; adjudication of 7.9.2004 – C-127/02, margin number 37; final applications by Advocate-General Sharpston on ECJ, adjudication of 14.1.2016 – C-399/14, margin number 65 and by Advocate-General Kokott on ECJ, adjudication of 7.9.2004 – C-127/02, margin number 57.
43cf. ECJ, adjudication of 14.1.2016 – C-399/14, margin number 55-57; BVerwG, adjudication of 17.1.2007 – 9 A 20.05, margin number 110 et sqq. and headnote 19.
44 BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 74; adjudication of 12.8.2009 – 9 A 64.07, margin number 52 with further references. cf. ECJ, adjudication of 14.1.2016 – C-399/14, margin number 60 et seq.
45cf. BVerwG, adjudication of 1.4.2015 – 4 C 6.14, margin number 16–31 and headnote; adjudication of 18.12.2014 – 4 C 35.13, margin number 30, 53
46cf. ECJ, adjudication of 15.5.2014 – C-521/12, margin number 36; adjudication of 16.2.2012 – C-182/10, margin number 75; adjudication of 11.9.2012 – C-43/10, margin number 114, 121.
47cf. ECJ, adjudication of 14.1.2016 – C-399/14, margin number 57; BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 390; adjudication of 9.7.2009 – 4 C 12.07, margin number 13–17. Practical example e.g. VGH, Mannheim, decision of 24.3.2014 – 10 p 216/13.
48cf. ECJ, adjudication of 11.9.2012 – C-43/10, margin number 122.
49cf. BVerwG, adjudication of 27.1.2000 – 4 C 2.99, JURIS, margin number 39.
50 ECJ, adjudication of 16.2.2012 – C-182/10, margin number 77.
51 ECJ, adjudication of 16.2.2012 – C-182/10, margin number 76.
52 BVerwG, decision of 3.6.2010 – 4 B 54.09.
53
54 see McGillivray Journal of Environmental Law 2012, 417 et sqq.; Clutten/Tafur 2012, 167 et sqq. See also the fundamental criticism of the usual weighting of economic and ecological public interests (Bastmeijer 2016, p. 387 (400 et sqq.)).
55cf. ECJ, adjudication of 11.9.2012 – C-43/10, margin number 121.
56 BVerwG, decision of 6.11.2013 – 9 A 14.12, margin number 72. Similar to BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 389.
57 BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 17; decision of 14.4.2011 – 4 B 77.09, margin number 42–45.
58 explicitly, ECJ, adjudication of 11.9.2012 – C-43/10, margin number 112. See also ECJ, adjudication of 14.1.2016 – C-399/14, margin number 43 f., 48 et seq.; adjudication of 15.5.2014 – C-521/12, margin number 20 et seq.; adjudication of 11.4.2013 – C-258/11 – Sweetman et al., margin number 29–41; adjudication of 7.9.2004 – C-127/02, margin number 41–49, 56–59.
59 BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 391; adjudication of 9.7.2009 – 4 C 12.07, margin number 15 and headnote 2.
60cf.
61cf.
62 BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 329 et seq. In contrast, a proposed development that first wishes to stimulate demand, for example, to promote economic development, has a lower weighting (BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 19), but may, correctly, actually not be necessary.
63 ‘The greater the extent of the uncertainties, the lower the weighting of the public interest in the proposed development and the more concrete and binding the objectives in support of the proposed development must be if it is still to be allocated high weighting in spite of the uncertain demand.’ (BVerwG, decision of 22.6.2015 – 4 B 59.14, margin number 30. Similar BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 392; adjudication of 9.7.2009 – 4 C 12.07, margin number 17; decision of 14.4.2011 – 4 B 77.09, margin number 42–45).
64 BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 329.
65 for inclusion in planned requirements, such as the German Federal Transport Infrastructure Plan or the plan for the Trans-European Transport Network (e.g. BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 70; adjudication of 8.1.2014 – 9 A 4.13, margin number 70; adjudication of 28.3.2013 – 9 A 22.11, margin number 102), for land-use planning (BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 70; adjudication of 9.7.2009 – 4 C 12.07, margin number 22).
66 Lesser weighting is therefore allocated to the very general aim of ‘the economic development of a region’ (recognised, e.g. in BVerwG, adjudication of 6.11.2013 – 9 A 14.12 margin number 70; adjudication of 8.1.2014 – 9 A 4.13, margin number 70; adjudication of 28.3.2013 – 9 A 22.11, margin number 102)
67 Annex II EU Commission Decision 406/2009; Annex I NEC Directive 2001/81/EC
68 BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 26. Similar, e.g. to BVerwG, adjudication of 12.3.2008 – 9 A 3.06, margin number 154, 164 et seq.; adjudication of 28.3.2013 – 9 A 22.11, margin number 99.
69cf. BVerwG, adjudication of 28.3.2013 – 9 A 22.11, margin number 100; adjudication of 6.11.2013 – 9 A 14.12, margin number 71; adjudication of 23.4.2014 – 9 A 25.12, margin number 77. Affirmative BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 407; adjudication of 9.7.2009 – 4 C 12.07, margin number 28–30; decision of 3.6.2010 – 4 B 54.09, margin number 21, if they also make a reasonable contribution towards the integrity of the affected site.
70cf. ECJ, adjudication of 15.5.2014 – C-521/12 – Briels, margin number 28-33.
71cf. BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 27.
72cf. BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 31.
73 ECJ, adjudication of 11.9.2012 – C-43/10, margin number 122.
74 e.g. BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 69 et seq.; adjudication of 23.4.2014 – 9 A 25.12, margin number 74 et sqq.
75 BVerwG, adjudication of 10.4.2013 – 4 C 3.12, margin number 19
76 BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 86.
77 BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 17 et seq., 23.
78 ECJ, adjudication of 16.2.2012 – C-182/10, margin number 78.
79 BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 22.
80 BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 19.
81cf. ECJ, adjudication of 14.4.2005 – C-441/03, margin number 27.
82
83 BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 8 et seq.; adjudication of 12.3.2008 – 9 A 3.06, margin number 152. In contrast, BVerwG, adjudication of 27.1.2000 – 4 C 2.99, JURIS, margin number 34.
84Ewer, in: Lütkes/Ewer, BNatSchG, 2011, § 34 margin number 65; Meßerschmidt 2014, § 34 margin number 197 et seq.
85cf. BVerwG, adjudication of 27.1.2000 – 4 C 2.99, JURIS, margin number 37–40.
86cf. ECJ, adjudication of 11.9.2012 – C-43/10, margin number 123-128; BVerwG, adjudication of 27.1.2000 – 4 C 2.99, JURIS, margin number 36.
87 ECJ, adjudication of 11.9.2012 – C-43/10, margin number 126.
88cf. ECJ, adjudication of 28.2.1991 – C-57/89, margin number 8; BVerwG, adjudication of 27.1.2000 – 4 C 2.99, JURIS, margin number 37.
89cf. BVerwG, adjudication of 10.4.2013 – 4 C 3.12, margin number 1 et seq., 19.
90 BVerwG, adjudication of 6.11.2012 – 9 A 17.11, margin number 66 et sqq.
91cf. Schumacher/Schumacher, in: Schumacher/Fischer-Hüftle, BNatSchG, 2011, § 34 margin number 99; Gellermann, in: Landmann/Rohmer, Umweltrecht, 2016, § 34 BNatSchG margin number 46.
92 BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 87.
93 BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 87.
94cf.
95 critical e.g. McGillivray 2015, p. 101 (109 et sqq.) and Krämer Journal of Environmental Law 2009, 59.
96 on recognition practice
97 BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 73.
98 ECJ, adjudication of 26.10.2006 – C-239/04, margin number 36.
99cf. BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 15; decision of 3.6.2010 – 4 B 54.09, margin number 9.
100 BVerwG, decision of 3.6.2010 – 4 B 54.09, margin number 9. Settled case law, e.g. BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 410; adjudication of 6.11.2013 – 9 A 14.12, margin number 74; adjudication of 12.3.2008 – 9 A 3.06, margin number 170; adjudication of 17.5.2002 – A 28.01, BVerwGE 116, p. 254 (262). Exception in the case of national defence (BVerwG, adjudication of 10.4.2013 – 4 C 3.12, margin number 19).
101cf. ECJ, adjudication of 26.10.2006 – C-239/04, margin number 36–40.
102 settled case law, e.g. BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 74 et seq.; adjudication of 23.4.2014 – 9 A 25.12, margin number 78; adjudication of 6.11.2012 – 9 A 17.11, margin number 70.
103cf. BVerwG, adjudication of 28.3.2013 – 9 A 22.11, margin number 105.
104cf. ECJ, adjudication of 26.10.2006 – C-239/04, margin number 36–40; BVerwG, decision of 28.11.2013 – 9 B 14.13, margin number 15; adjudication of 6.11.2013 – 9 A 14.12, margin number 75.
105 BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 88.
106 BVerwG, decision of 28.11.2013 – 9 B 14.13, margin number 15; adjudication of 6.11.2013 – 9 A 14.12, margin number 75.
107 BVerwG, decision of 3.6.2010 – 4 B 54.09, margin number 9.
108 BVerwG, decision of 3.6.2010 – 4 B 54.09, margin number 9. Settled case law, e.g. BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 410; adjudication of 6.11.2012 – 9 A 17.11, margin number 70; adjudication of 17.1.2007 – 9 A 20.05, margin number 143.
109 so e.g. BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 418
et seq.;
Gellermann, in: Landmann/Rohmer, Umweltrecht, 2016, § 34 BNatSchG margin number 36;
Mühlbauer, in: Lorz et al., Naturschutzrecht, 2013, § 34 BNatSchG margin number 22. Other opinion
110 e.g. BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 414 et seq. For example, for the BVerwG, an A-road is no longer an alternative to an intercity motorway (BVerwG, adjudication of 8.1.2014 – 9 A 4.13, margin number 73), which is not a convincing argument, given the potential for standards of construction with four lanes and no crossings that are also possible for A-roads.
111Winter NuR 2010, 601 (605). cf. BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 411, but restricting to public aims named by the developer; BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 78 et seq. in relation to the question of whether an urban motorway actually constitutes a different project to an intercity motorway; BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 80 in relation to bypasses with three to four lanes instead of a motorway; BVerwG, adjudication of 9.7.2009 – 4 C 12.07, margin number 34 et seq. in relation to short-haul airports instead of intercontinental airports.
112 BVerwG, decision of 3.6.2010 – 4 B 54.09, margin number 9 f.; Winter NuR 2010, 601 (606).
113 BVerwG, decision of 3.6.2010 – 4 B 54.09, margin number 9; Advocate-General Kokott in ECJ, adjudication of 26.10.2006 – C-239/04, margin number 46; Winter NuR 2010, 601 (605). Different BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 412.
114cf. ECJ, adjudication of 15.5.2014 – C-521/12 – Briels, margin number 36; BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 411; adjudication of 28.3.2013 – 9 A 22.11, margin number 99, 111.
115cf. Advocate-General Kokott in ECJ, adjudication of 26.10.2006 – C-239/04, margin number 43; Winter NuR 2010, 601, 605.
116 BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 411 et seq.
117cf. BVerwG, adjudication of 28.3.2013 – 9 A 22.11, margin number 105; decision of 3.6.2010 – 4 B 54.09, margin number 6, 10; adjudication of 9.7.2009 – 4 C 12.07, margin number 16 and 33.
118cf. ECJ, adjudication of 26.10.2006 – C-239/04, margin number 38.
119 BVerwG, adjudication of 27.1.2000 – 4 C 2.99, JURIS, margin number 31. Confirming, e.g. BVerwG, adjudication of 28.3.2013 – 9 A 22.11, margin number 105; adjudication of 6.11.2012 – 9 A 17.11, margin number 70.
120 ECJ, adjudication of 14.1.2016 – C-399/14, margin number 77.
121 BVerwG, adjudication of 17.1.2007 – 9 A 20.05, margin number 142; adjudication of 28.3.2013 – 9 A 22.11, margin number 110.
122 ECJ, adjudication of 14.1.2016 – C-399/14, margin number 68–75.
123BVerwG, decision of 3.6.2010 – 4 B 54.09, margin number 7.
124 European Commissiom 2013b.
125cf.
126cf. TEEB 2011.
127cf. BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 85.
128 BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 78; adjudication of 6.11.2013 – 9 A 14.12, margin number 74, 80; adjudication of 28.3.2013 – 9 A 22.11, margin number 105.
129cf. BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 84; adjudication of 28.3.2013 – 9 A 22.11, margin number 102, 109, however, with this being allocated greater weighting.
130 BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 72.
131 BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 90.
132 BVerwG, adjudication of 6.11.2012 – 9 A 17.11, margin number 80.
133 BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 75. Settled case law, e.g. BVerwG, adjudication of 28.3.2013 – 9 A 22.11, margin number 105; adjudication of 12.3.2008 – 9 A 3.06, margin number 170 et seq.
134cf. BVerwG, adjudication of 8.1.2014 – 9 A 4.13, margin number 72; adjudication of 6.11.2013 – 9 A 14.12, margin number 87; adjudication of 28.3.2013 – 9 A 22.11, margin number 107.
135 BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 84, 86; decision of 9.12.2011 – 9 B 44.11, margin number 7.
136 similar to Gellermann, in: Landmann/Rohmer, Umweltrecht, 2016, § 34 BNatSchG margin number 37.
137cf. only ECJ, adjudication of 11.4.2013 – C-258/11, margin number 37 et sqq.; adjudication of 24.11.2011 – C-404/09, margin number 97 et sqq.; adjudication of 14.1.2016 – C-141/14, margin number 63 et sqq.; BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 67 et sqq., 71 et sqq.; adjudication of 28.3.2013 – 9 A 22.11, margin number 71 et sqq.
138 ECJ, adjudication of 20.5.2010 – C-308/08, margin number 25; adjudication of 24.11.2011 – C-404/09, margin number 146 et sqq., 166 et sqq.; adjudication of 14.1.2016 – C-141/14, margin number 59, 75; BVerwG, decision of 23.1.2015 – 7 VR 6.14, margin number 16, 27; adjudication of 14.7.2011 – 9 A 12.10, margin number 93; adjudication of 14.4.2010 - 9 A 5.08, margin number 33.
139 ECJ, adjudication of 20.5.2010 – C-308/08, margin number 37–52; BVerwG, decision of 23.1.2015 – 7 VR 6.14, margin number 27; decision of 7.2.2011 – 4 B 48.10, margin number 6.
140 ECJ, adjudication of 15.5.2014 – C-521/12, margin number 12, 23; adjudication of 13.12.2007 – C-418/04, margin number 256 et seq.; BVerwG, adjudication of 12.3.2008 – 9 A 3.06, margin number 97 et sqq.
141 Nitrogen: ECJ, adjudication of 15.5.2014 – C-521/12, margin number 12, 23, adjudication of 11.9.2012 – C-43/10, margin number 98 et sqq.; BVerwG, decision of 5.9.2012 – 7 B 24.12, margin number 7 et sqq.; adjudication of 23.4.2014 – 9 A 25.12, margin number 26 et seq., 45 et seq.; adjudication of 29.9.2011 – 7 C 21.09, margin number 41; adjudication of 14.4.2010 – 9 A 5.08, margin number 87; decision of 26.11.2007 – 4 BN 46.07, margin number 11; adjudication of 12.3.2008 – 9 A 3.06, margin number 107 et sqq.; adjudication of 17.1.2007 – 9 A 20.05, margin number 101 et sqq. Chloride: BVerwG, adjudication of 3.5.2013 – 9 A 16.12, margin number 36 et sqq.; adjudication of 14.7.2011 – 9 A 12.10, margin number 78. Noise/vibration: ECJ, adjudication of 24.11.2011 – C-404/09, margin number 146 et sqq., 166 et sqq.; BVerwG, adjudication of 18.12.2014 – 4 C 35.13, margin number 34, 43 et seq.; adjudication of 28.3.2013 – 9 A 22.11, margin number 84, 88 et seq.; adjudication of 6.11.2012 – 9 A 17.11, margin number 45; adjudication of 23.4.2014 – 9 A 25.12, margin number 51. Light/optical disturbance: BVerwG, adjudication of 28.3.2013 – 9 A 22.11, margin number 74–76; adjudication of 23.4.2014 – 9 A 25.12, margin number 51.
142 In contrast, in the case of an alternative being financially disproportionate, the BVerwG recognises ‘the severity of the adverse impact on the site, the number and importance of any habitat types or species that may be affected and the degree of incompatibility with the conservation aims’ as criteria for assessment (BVerwG, adjudication of 28.3.2013 – 9 A 22.11, margin number 105). Probably similar to the necessity for demolishing a proposed development built prematurely (BVerwG, decision of 6.3.2014 – 9 C 6.12, margin number 47).
143 see footnote 29.
144 ECJ, adjudication of 14.1.2016 – C-399/14, margin number 74.
145cf. only ECJ, adjudication of 15.5.2014 – C-521/12, margin number 27.
146 as stated in BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 79. cf. Winter NuR 2010, 601 (603 et sqq.).
147cf. BVerwG, decision of 3.6.2010 – 4 B 54.09, margin number 7.
148cf. ECJ, adjudication of 11.9.2012 – C-43/10, margin number 114;
149
150Kettunen et al. 2007, p. 38 et sqq.
151cf. ECJ, adjudication of 11.9.2012 – C-43/10, margin number 114, 119, 130-133, 128; adjudication of 15.5.2014 – C-521/12 – Briels, margin number 34; adjudication of 26.10.2006 – C-239/04, margin number 34 f.; BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 418; adjudication of 17.1.2007 – 9 A 20.05, margin number 148 and headnote 22.
152
153
154 ECJ, adjudication of 11.9.2012 – C-43/10, margin number 144, 130 et seq.; adjudication of 24.11.2011 – C-404/09, margin number 109; BVerwG, adjudication of 23.4.2014 – 9 A 25.12, margin number 88.
155cf. ECJ, adjudication of 15.5.2014 – C-521/12, margin number 38;
156
157 BVerwG, adjudication of 6.11.2013 – 9 A 14.12, margin number 93. Settled case law, e.g. BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 418–420, adjudication of 6.11.2012 – 9 A 17.11, margin number 82; adjudication of 12.3.2008 – 9 A 3.06, margin number 199 et seq.
158 BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 419; adjudication of 6.11.2013 – 9 A 14.12, margin number 93; adjudication of 12.3.2008 – 9 A 3.06, margin number 200.
159 BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 419; decision of 14.4.2011 – 4 B 77.09, margin number 29. This demanding Therivel Environmental Impact Assessment Review 2009, 261 (Fig. 2 at p. 263).
160cf. to the practical challenges McGillivray 2015, p. 101 (106 et sqq.).
161 BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 420; adjudication of 6.11.2013 – 9 A 14.12, margin number 94; adjudication of 12.3.2008 – 9 A 3.06, margin number 201.
162 BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 421; adjudication of 6.11.2013 – 9 A 14.12, margin number 94; adjudication of 12.3.2008 – 9 A 3.06, margin number 202.
163 BVerwG, adjudication of 6.11.2012 – 9 A 17.11, margin number 88.
164 cf. Milieu, IEEP and ICF 2016, p. 106.
165
166cf. ECJ, adjudication of 15.5.2014 – C-521/12 – Briels, margin number 28-33; BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 422 et sqq.; Trouwborst 2016, p. 219 (242 et sqq.).
167cf. BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 423; Dolde/Lange VBlBW 2015, 1 (4 et seq.).
168 i.e., a coherence measure is better than a conservation measure that, while it has been planned, is never realised due to a lack of, e.g., financial resources.
169 e.g. BVerwG, adjudication of 9.2.2017 – 7 A 2.15, margin number 421.
170cf.
171 BVerwG adjudication of 6.11.2013 – 9 A 14.12, margin number 101; decision of 14.4.2011 – 4 B 77.09, margin number 29 et seq.
172 BVerwG, adjudication of 28.3.2013 – 9 A 22.11, margin number 112; adjudication of 23.4.2014 – 9 A 25.12, margin number 88.
173 BVerwG, adjudication of 6.11.2012 – 9 A 17.11, margin number 85 et sqq.; adjudication of 23.4.2014 – 9 A 25.12, margin number 88; adjudication of 6.11.2013 – 9 A 14.12, margin number 103 et seq.
174cf. Reminder of the European Commission from 27.2.2015, no. 2014/2262.
175 for reasons including because the BVerwG and the Higher Administrative Courts of the Länder are increasingly submitting questions to the ECJ (cf. most recently, e.g. in the case of ECJ, adjudication of 14.1.2016 – C-399/14).